PROJECT DETAILS

Client: Minnesota Department of Transportation – District 8

Location: Willmar, MN

Willmar Wye Preliminary Design 495x400 Rani Engineering, LLC Minneapolis, Minnesota

PROJECT DESCRIPTION

MnDOT, BNSF and the City of Wilmar were investigating preliminary alternatives to add 2.7 miles of track along CSAH 55 to connect Morris and Marshall subdivision tracks. A realignment of TH 12 and other local roads is required to add the track and two alternative designs were proposed. The proposed road designs include a bypass, overpass, and raised intersections.  Rani was a subconsultant on the design team, responsible for the drainage analysis and design for these preliminary alternatives.

RANI SOLUTION

Rani provided a hydraulic design and analysis memo for each of the design alternatives. The design team developed a drainage overview map and layout using MnDOT, MPCA, and City of Willmar standards.

Professional services included:

  • Watershed delineation and hydrologic analysis
  • Comprehensive modeling of entire contributing watershed
  • Identification of stormwater ponding needs and recommended locations
  • Preliminary pond, ditch, and culvert design and sizing
  • Pond outlet design to meet rate control requirements
  • Hydraulic design and analysis memo
  • Drainage Overview Map and Layout
  • Coordination with roadway design team and BNSF railroad design team