Trunk Highway 212 Expansion

Trunk Highway 212 Expansion

  Transportation

Project Challenge

This unique design-build project incorporated urban and rural highway design in the Twin Cities metro area along a previously undeveloped highway corridor. The project included seven interchanges, 29 bridges and multiple waterway crossings. The need to provide efficient transportation for a rapidly growing population meant that a new alignment for TH 212 was essential to meet the needs of the southwestern suburbs as Hennepin and Carver Counties continue to grow.

Rani Engineering Solution

  • Engineered roads and designed drainage system with GEOPAK XP-SWMM
  • Designed stormwater treatment and wetland pond, special ditch design
  • and culvert system
  • Prepared drainage plan, profile, tab and detail sheets
  • Coordinated 5 miles of urban drainage design, 12 ponds and outfall structures
  • Prepared site contours and grading
  • Designed horizontal and vertical roadway geometrics